Complete Projects
| Project | Category | Area | Description |
|---|---|---|---|
| File cabinet locks | Fixit Job | Office |
Install locks on the bottom two drawers on the wooden file cabinets in the office. Locks on the top two drawers were installed by Eric Owsley this summer. See Christi for details. |
| Install Smoke Detector - in Toddler Cottage | Fixit Job | Toddler |
Install/replace a smoke detector in Toddler Cottage |
| Campus-wide mold assessment | Subcontractor Job | Other |
Peter Palmer will conduct a mold assessment of all classrooms on campus. |
| Wash exterior of Primary II and Toddler buildings | Subcontractor Job |
Primary II Toddler |
As per Peter Palmer's recommendation, the exterior of the Primary II and Toddler buildings should be hand scrubbed with a mild bleach solution and soft bristle brushes. This job will require... |
| Gutter / rain barrel | Subcontractor Job |
Primary II Toddler |
A gutter needs to be installed on the Toddler building that drains into the new rain barrel. Gutters should also be installed on the Primary II building. Estimates should be obtained from local... |
| Pre-toddler Fence and Ramp | Volunteer-Multiple Job | Pre-Toddler |
Build fence on pre-toddler porch. Build ramp and gates to fence. |
| Grounds work by W&L volunteers | Volunteer-Multiple Job | Grounds |
Mowing, weedeating, sweeping campus. |
| Dig french drain beside Primary II | Volunteer-Multiple Job | Grounds |
As per Peter Palmer's instructions, a french drain or trench needs to be dug on the right side of the Primary II building in order to direct water flow off campus and reduce moisture in that area.... |
| Lunch for VMI workday | Volunteer-Multiple Job | Other |
Lunch, drinks, and snacks need to be provided for approximately 15 cadets and 5-10 parent volunteers during the workday. A supply of water bottles leftover from the W&L workday are already on... |
| Removal of posts on playground | Volunteer-Solo Job | Grounds |
Posts on the playground need to be removed by a very strong person. |