Open Projects

Project Category Area Project Description
Prune trees overhanging buildings Subcontractor Job Grounds

An estimate has been acquired from Raleigh Mason (arborist) to prune and/or remove trees on campus that are impinging on roofs on campus. At the B&G meeting on 11-13-09 it was decided that as...

Replace cap railing/spindle on stoop of Primary II Volunteer-Multiple Job Primary II

Put up a new cap railing on the front steps of Primary II. One slat is missing for the railing at the top of the landing for the Primary II cottage.

Toddler playground fence repair Volunteer-Multiple Job Grounds

Several sections of the fence surrounding the Toddler playground are broken. The posts appear to be in good shape.

Tack up insulation under Toddler building Volunteer-Multiple Job Toddler

The insulation under the Toddler building is falling down and needs to be secured. This area is accessed behind the Toddler building.

Green Gate at Toddler walkway needs adjustment Volunteer-Multiple Job Toddler

Green Gate at Toddler walkway needs to be secured. We may need to have a piece of wood added to system to allow for more security. Children have been able to push against the gate and open it....

Parking Lot Improvements Volunteer-Multiple Job
Grounds
Other

Two areas of the parking lot require intervention so they will be usable during upcoming adverse weather seasons. The area closest to the Woods Creek rain garden is muddy and cannot support...

Fix Fence Gate at top of hill (4x6 fence with brackets) Volunteer-Multiple Job Other

One post is higher, so the brackets do not line up. The uphill post needs to be lowered to line up brackets and to enable teachers to easily remove handled log.

Drainage Solution: Pre-Toddler Playground Area Volunteer-Multiple Job Grounds

This needs to be a phased project. VMI workday consists of rerouting/ditch augmentation.

Water source (perhaps spring) creates standing water areas.
-Large black sonic pipe needs to...

Small Retaining wall to stop erosion Volunteer-Multiple Job Grounds

Slope by the large chainlink gate of the Toddler cottage needs to have the erosion stopped. Some sort of small retaining wall or even a couple pieces of wood need to be created to stop the...

Change the flood lights by the Primary I and Pre-Toddler building Volunteer-Multiple Job Primary I

Change lights. Bulbs are in the office.

Replace push bars on doors Volunteer-Solo Job Primary I

Primary I and Pre-Toddler doors have broken push bars on their doors. They lock, but a key will no longer open the Primary I door. Cost is about $100-$200 per door at Doorware.com.

Router relocation Volunteer-Solo Job Office

The router needs to be moved from the office to the space above the office in order for the Toddle building to get reception.

Weedeating/Mowing Coordinator needed Volunteer-Solo Job Grounds

A B&G team member needs to be recruited to assume responsibility for regular weedeating and mowing. Consult with Christi to determine how often it needs to be done.

Remediate trash collection area Volunteer-Solo Job Grounds

Three or four large, heavy trash cans with hinged lids need to be purchased. At least one trash can needs to be clearly marked for recyling.
A large supply of heavy trash bin liners need to...

Change orientation of entry gate: Pre-Toddler Volunteer-Solo Job Pre-Toddler

Entry gate to the Pre-Toddler porch needs to swing in the opposite direction

Install new light fixtures Volunteer-Solo Job
Primary I
Toddler

In response to the Lexington Fire Inspector's concerns, some light fixtures in the main building need to be replaced. Christi has purchased the materials, and a volunteer is needed to install them...

Repair/ re-glue floor tiles Volunteer-Solo Job Primary II

Re-glue tiles in the Primary II cottage starting in the bathroom.

Weather protect the bottom of the Office Door Volunteer-Solo Job Office

Put weather stripping or what ever type of stuff is needed on the bottom of the door to prevent water and cold air from coming in the office!

Map electrical circuitry in main building W&L Job
Primary I
Pre-Toddler

By instruction of the Lexington Fire Inspector (Steve Paulk), we need to create a map of the circuits in the main building in order to determine if electrical service to the building is sufficient...