Open Projects
| Project | Category | Area | Project Description | ||
|---|---|---|---|---|---|
| Prune trees overhanging buildings | Subcontractor Job | Grounds |
An estimate has been acquired from Raleigh Mason (arborist) to prune and/or remove trees on campus that are impinging on roofs on campus. At the B&G meeting on 11-13-09 it was decided that as... |
Project Signup | |
| Replace cap railing/spindle on stoop of Primary II | Volunteer-Multiple Job | Primary II |
Put up a new cap railing on the front steps of Primary II. One slat is missing for the railing at the top of the landing for the Primary II cottage. |
Project Signup | |
| Toddler playground fence repair | Volunteer-Multiple Job | Grounds |
Several sections of the fence surrounding the Toddler playground are broken. The posts appear to be in good shape. |
Project Signup | |
| Tack up insulation under Toddler building | Volunteer-Multiple Job | Toddler |
The insulation under the Toddler building is falling down and needs to be secured. This area is accessed behind the Toddler building. |
Project Signup | |
| Green Gate at Toddler walkway needs adjustment | Volunteer-Multiple Job | Toddler |
Green Gate at Toddler walkway needs to be secured. We may need to have a piece of wood added to system to allow for more security. Children have been able to push against the gate and open it.... |
Project Signup | |
| Parking Lot Improvements | Volunteer-Multiple Job |
Grounds Other |
Two areas of the parking lot require intervention so they will be usable during upcoming adverse weather seasons. The area closest to the Woods Creek rain garden is muddy and cannot support... |
Project Signup | |
| Fix Fence Gate at top of hill (4x6 fence with brackets) | Volunteer-Multiple Job | Other |
One post is higher, so the brackets do not line up. The uphill post needs to be lowered to line up brackets and to enable teachers to easily remove handled log. |
Project Signup | |
| Drainage Solution: Pre-Toddler Playground Area | Volunteer-Multiple Job | Grounds |
This needs to be a phased project. VMI workday consists of rerouting/ditch augmentation. Water source (perhaps spring) creates standing water areas. |
Project Signup | |
| Small Retaining wall to stop erosion | Volunteer-Multiple Job | Grounds |
Slope by the large chainlink gate of the Toddler cottage needs to have the erosion stopped. Some sort of small retaining wall or even a couple pieces of wood need to be created to stop the... |
Project Signup | |
| Change the flood lights by the Primary I and Pre-Toddler building | Volunteer-Multiple Job | Primary I |
Change lights. Bulbs are in the office. |
Project Signup | |
| Replace push bars on doors | Volunteer-Solo Job | Primary I |
Primary I and Pre-Toddler doors have broken push bars on their doors. They lock, but a key will no longer open the Primary I door. Cost is about $100-$200 per door at Doorware.com. |
Project Signup | |
| Router relocation | Volunteer-Solo Job | Office |
The router needs to be moved from the office to the space above the office in order for the Toddle building to get reception. |
Project Signup | |
| Weedeating/Mowing Coordinator needed | Volunteer-Solo Job | Grounds |
A B&G team member needs to be recruited to assume responsibility for regular weedeating and mowing. Consult with Christi to determine how often it needs to be done. |
Project Signup | |
| Remediate trash collection area | Volunteer-Solo Job | Grounds |
Three or four large, heavy trash cans with hinged lids need to be purchased. At least one trash can needs to be clearly marked for recyling. |
Project Signup | |
| Change orientation of entry gate: Pre-Toddler | Volunteer-Solo Job | Pre-Toddler |
Entry gate to the Pre-Toddler porch needs to swing in the opposite direction |
Project Signup | |
| Install new light fixtures | Volunteer-Solo Job |
Primary I Toddler |
In response to the Lexington Fire Inspector's concerns, some light fixtures in the main building need to be replaced. Christi has purchased the materials, and a volunteer is needed to install them... |
Project Signup | |
| Repair/ re-glue floor tiles | Volunteer-Solo Job | Primary II |
Re-glue tiles in the Primary II cottage starting in the bathroom. |
Project Signup | |
| Weather protect the bottom of the Office Door | Volunteer-Solo Job | Office |
Put weather stripping or what ever type of stuff is needed on the bottom of the door to prevent water and cold air from coming in the office! |
Project Signup | |
| Map electrical circuitry in main building | W&L Job |
Primary I Pre-Toddler |
By instruction of the Lexington Fire Inspector (Steve Paulk), we need to create a map of the circuits in the main building in order to determine if electrical service to the building is sufficient... |
Project Signup |